In this version, we've fixed the following issues:
Mavim Manager
We have added the BPMN Orchestration, BPMN Collaboration and ArchiMate 2.1 buttons back to the Edit Tab.
Mavim Portal
When editing Topic Tabs, the topic field goes blank momentarily. This is now resolved.
Visual Modelling & Visio
Shape selection in Visio charts was not functioning correctly. Selecting a shape in the drawing could fail or a related shape was selected instead.
Applying another stencil to BPMN collaborations resulted in wrongly connected or disconnected messages flows. Also, the layout was not always fully preserved. When the drawing was saved and then reopened, the glitches were automatically corrected.
When selecting different shapes in BPMN charts, some incorrect behavior was found such as: o Some visual attributes were incorrect.
o The Z-order of shapes inside a pool was changed incorrectly.
o The form for selecting another shape for a pool was shown twice.
Shape sizes were incorrectly reset to default and links were disconnected when selecting another shape in ArchiMate charts.
When expanding a pool of a BPMN Collaboration, lanes were sometimes duplicated.
When launching a BPMN chart from the Overview menu in Mavim Manager, a new chart was always created even if a chart already existed for the topic.
BPMN collaborations could show disconnected red message flows when opening charts containing collapsed pools.