PRODUCT UPDATE
JUNE 2023 


What is fixed?

​​​​​​​

In this version, we've fixed the following issues:

Mavim Process Mining


  • Updated the ETL script to correctly interpret the column “cost” of the event log to be transformed to the data field “activity_cost”.
     
  • The shapes of the lanes in a BPMN collaboration chart were parsed as activities in the ‘targetprocess’, this is now fixed. 

Visual Modelling & Visio


  • When removing the connection between a shape in a Generic Chart and a Topic in Mavim Manager, the connection was not removed correctly. 
     
  • When connecting several shapes in a Generic Chart with Topics in Mavim Manager, performance decreased over time.
     
  • When renaming a newly dropped BPMN Task shape, using the Attributes screen, the new name would appear above the shape.